Algebraic solution of a problem of optimal project scheduling in project management
DOI:
https://doi.org/10.21638/spbu01.2021.107Abstract
A problem of optimal scheduling is considered for a project that consists of a certain set of works to be performed under given constraints on the times of start and finish of the works. As the optimality criterion for scheduling, the maximum deviation of the start time of works is taken to be minimized. Such problems arise in project management when it is required, according to technological, organizational, economic or other reasons, to provide, wherever possible, simultaneous start of all works. The scheduling problem under consideration is formulated as a constrained minimax optimization problem and then solved using methods of tropical (idempotent) mathematics which deals with the theory and applications of semirings with idempotent addition. First, a tropical optimization problem is investigated defined in terms of a general idempotent semifield (an idempotent semiring with invertible multiplication), and a complete analytical solution of the problem is derived. The result obtained is then applied to find a direct solution of the scheduling problem in a compact vector form ready for further analysis of solutions and straightforward computations. As an illustration, a numerical example of solving optimal scheduling problem is given for a project that consists of four works.Keywords:
idempotent semifield, tropical optimization, minimax optimization problem, project scheduling, project management
Downloads
References
Литература
References
Downloads
Published
How to Cite
Issue
Section
License
Articles of "Vestnik of Saint Petersburg University. Mathematics. Mechanics. Astronomy" are open access distributed under the terms of the License Agreement with Saint Petersburg State University, which permits to the authors unrestricted distribution and self-archiving free of charge.